Traffic Update: Projects affecting San Marcos traffic Dec. 18-24 Online: sanmarcostx.gov/traffic  

Projects affecting San Marcos traffic Jan. 29 – Feb 04

Online: sanmarcostx.gov/traffic

 

WOODS ST: A segment of Woods Street between Comanche and North Street will be closed during construction of the new Texas State University Engineering & Science Building until Aug. 2018. Project Manager Scott Rouse, 512-245-2202.

 

SESSOM DR: There will be single lane closures from N. LBJ to Aquarena Springs through March 31, weather permitting, from 8 a.m. to 5 p.m. daily for overhead utility work. CenturyLink, 903-675-0406.

 

PATTON ST/KNOX/WAVELL: Patton St. to Knox and Patton St. to Wavell will be closed for a utility installation through Jan. 31 daily, weather permitting. Please obey all detour signs. Rockin Q. Construction, 512-557-8748.

 

SESSOM DR: There will be a one lane west bound closure for telecom installation on Sessom Dr. from N. LBJ to Aquarena Springs through Feb. 16 from 9 a.m. – 4 p.m. Grande Communications, 512-590-9658.

 

LP 82/LAUREL LANE: Various right and left lane closures will commence on LP 82 traveling both east and west bound for construction through Feb. 10 from 9 a.m. – 4 p.m., weather permitting. The closures will run from Bobcat Village entrance west bound for the paving of the east bound temporary single lane detour. Please use Sessom Drive and Ed J L Green Drive to access Laurel Drive. TxDOT, 512-905-3097

 

IH35 SB EXIT RAMP: Two outside lanes going north bound and south bound at the exit ramps between Yarrington Rd. and RM 150 will be intermittently closed for construction through Feb. 3 from 9 a.m – 3 p.m. TxDOT, 512-587-8895

 

PEQUES ST: There will be a one lane north bound closure for telecom installation at the intersection of Peques and the 300-800 block of Sessom to the end of the Texas State Parking lot through Feb. 16 from 9 a.m. – 4 p.m. Grande Communications, 512-590-9658

 

417 COMANCHE: The south bound lane at the 400 blk of Comanche between Lindsey and Pat Garrison will be closed through Feb. 4 from 7 a.m. – 4 p.m. for construction maintenance. Be aware of flaggers. Skyline builders/Matthew Ostrowski, 512-699-6465

 

EAST SAN ANTONIO STREET: Every Saturday from 8 a.m. – 3 p.m.  Half a block of street closed from the alley to N. LBJ for the Farmers Market on the Square. Main Street Program, 512-393-8430

 

LONG TERM ROAD PROJECTS:

 

• N LBJ: From Holland St. to Camaro Way will be closed to through traffic until the Spring of 2017. Road closure will occur during daytime construction hours. 

 

City contractor will be replacing utility lines in the area. Through traffic including Emergency Vehicles, will be routed around the project limits; please follow the detours. Engineering/Capital Improvements, 512-393-8130                                        

San Marcos Record

P.O. Box 1109
San Marcos, Tx 78666
Phone: 512-392-2458
Fax: 512-392-6483